Does your company have an assured equipment grounding conductor program (AEGCP)? Do you dread the lost worker time by regular inspection and documentation requirements, or maybe haven’t kept up with record keeping? There is an answer to these questions.
With 154 electrical workplace fatalities in 2016, and 1,640 nonfatal workplace electrical injuries, electrical safety isn’t just a good idea, it’s a lifesaver. One of the ways workers are protected on the job site, is with an Assured Equipment Grounding Conductor program. This applies to extension cords on job sites, making sure the equipment grounding functionality is intact.
Any AEGC program will have to meet OSHA 1926.404 (b)(1)(iii) mandates for construction sites. Daily inspections will be conducted on all extension cords before each day’s use, and at regular intervals, the cords will be tested tests. Lastly, test results need to be documented, but documentation can easily lapse even when the testing is conducted
The Ericson Smart Monitor™ visual diagnostic plug and connector series offers these advantages and more. In addition to open grounding conductor testing, Ericson’s Smart Monitor™ provides feedback on when other conditions such as open neutral, hot on ground, and hot/neutral swap.
The always on feature saves the time of rounding up all the extension cords, plus eliminates the time it takes to test, saving you money. OSHA compliance is assured as now all cables are tested and none overlooked. But most importantly, it increases safety. The cords are essentially tested at every use, not just periodically, avoiding a bad cable slipping through the cracks and being used.
Review your assured grounding conductor program, and revise to include the use of Smart Monitor devices. Install devices on the extension cords, and train users on the operation. Consider stocking the devices so that new cords can easily be converted, or buy cords with Smart Monitors already installed.